Did not manage to get a snapshot of the place before the demolish works started.

We were there early in the morning with out Bestest for prayers, going thru all the necessary and requirements.

And here it is....everything smashed into pieces.


Neat work by Beverly and team.

Tiles will be up these two days....seems like everything is in order, process should end by 3rd week of March. Looks like we can stay in by end March. *jumps around and giggles* However, after e-v-e-r-y-t-h-i-n-g is done, my shoulders are so very heavy. Will try my best to clear 50% of everything by end of this year, finish the rest by end of next year.

Have changed my cooker to something sleeker =) Some say it's good, some not. Anyway, am tired of looking, will go with my gut feel =) Costs us $400 with GST/-



Changed another bigger fridge, with lower electricity consumption. Cost us ermmm...due to some contracts signed, can't reveal here =P

Found a good electrician, window specialist and laminate flooring - all within our budget.

Electrician for $2,400:
- 15 light points
- 15 double 13AMP points
- 5 single 13AMP points (with one waterproof)
- 4 TV and TEL points
- DB board (18 way)
- Install 6 ceiling lights + all other lights
- Install 2 sets of cove lightings
- Install 1 water heater point for oven
- Earth bonding wires to pipes
- Submission to HDB + apply for SP testing approval
- Re-wiring for whole house
- All switches provided (Big button)

Window specialist for $3,000:
(All green windows with white powder coated frame)
- Living sliding windows with non see-thru film
- Front room sliding windows with non see-thru film
- Front room top hung windows
- Master, back room and kitchen - casement windows X 4 panels
- Wrought iron grilles for living and front room

Laminate Flooring for lesser than $ * * * *
- Power Dekor new colour for 3 bedrooms!